This section describes how to install the wind tower

2022-11-11

Wind tower device: determine the anchor point of the base, the base plate point, and then screw into the ground anchor, digging pit. In case of poor soil quality, the use of concrete pouring essentials for digging pits.

 

This is followed by the substrate and pipe fitting device, which is reinforced with "L" iron bars. Some hoist devices, measuring the opposite bias of the wind tower lying down, 9.1 meters away from the base plate, the hoist needs to use 12 volt battery. Before the installation of the tower and pipe, grease should be daubed on the junction and sledgehammer should be used to hammer down the junction to prevent the deflection of the windometer when the tower barrel is erected.

 

Raise the wind tower. When the wind tower is raised at the beginning, the top of the guide rod should be pulled tight by the personnel at both ends with ropes and stick to a straight line. Slow raise the wind tower, adhere to the guide rod straight, do not make the guide rod shake. The winch drags the top of the guide rod, and all the cables at 5 points of the wind tower are firmly to the top of the guide rod. Use wire clips to secure the cable and anchor. Each cable uses 3 wire cards, the distance is 20mm.

 

Raise the wind tower. When the wind tower is raised at the beginning, the top of the guide rod should be pulled tight by the personnel at both ends with ropes and stick to a straight line. Slow raise the wind tower, adhere to the guide rod straight, do not make the guide rod shake. The winch drags the top of the guide rod, and all the cables at 5 points of the wind tower are firmly to the top of the guide rod. Use wire clips to secure the cable and anchor. Each cable uses 3 wire cards, the distance is 20mm.

 

Wind tower sensor 40M: 1 anemometer; A windsock (with a lightning rod). 30M: one anemometer, one wind direction: 10M: one anemometer.

 

Recorder device, for the sake of tranquility, recorder device at a specific height, the sensor wire and lightning rod copper wire must be rotated downward around the tower barrel, and the end of the recorder and a copper rod through the substrate connection.